Description
Please contact Sunny sales@xiongbagk.cn for the best price.
➱ sales manager: Sunny
➱ email mailto: sales@xiongbagk.cn
➱ Skype/WeChat: 18059884797
➱ phone/Whatsapp: + 86 18059884797
➱ QQ: 3095989363
➱ Website:www.sauldcs.com
$1,500.00 $1,000.00
Product ID:3BHE026284R0101
ABB Type Designation:UAD215A101
Catalog Description:UA D215 A101: PEC80 Converter Signal Int
Long Description:UA D215 A101: PEC80 Converter Signal Int
Country of Origin:Switzerland (CH)
Customs Tariff Number:85371092
Product Net Depth / Length:440 mm
Product Net Height:43 mm
Product Net Weight:0.41 kg
Product details:
Product ID:3BHE026284R0101
ABB Type Designation:UAD215A101
Catalog Description:UA D215 A101: PEC80 Converter Signal Int
Long Description:UA D215 A101: PEC80 Converter Signal Int
Country of Origin:Switzerland (CH)
Customs Tariff Number:85371092
Product Net Depth / Length:440 mm
Product Net Height:43 mm
Product Net Weight:0.41 kg
UAD215A101 3BHE026284R0101 UA D215 A101 Converter Signal Interface for D5 UN6800 & UNL 13300.Fault handling of generator magnetic loss
The serious loss of magnetic fault of generator is directly related to the decrease of grid voltage speed and supply quality. Due to the rapid voltage reduction time, the power grid appears serious shock phenomenon, resulting in a wide range of power outage accident, which has a great impact on the safety of users. Therefore, you need to effectively analyze the damage to user security and handle the fault in a timely manner. In order to ensure that the faulty generator can be separated from the generator set as soon as possible, isolation shutdown method should be adopted to strengthen the overhaul and maintenance of the generator set.
Recommended model:
Please contact Sunny sales@xiongbagk.cn for the best price.
➱ sales manager: Sunny
➱ email mailto: sales@xiongbagk.cn
➱ Skype/WeChat: 18059884797
➱ phone/Whatsapp: + 86 18059884797
➱ QQ: 3095989363
➱ Website:www.sauldcs.com