IS200JPDFG2AED MARK VIe DC PDM CARD

The power distribution board is suitable for AC and DC power stations of coastal, ocean and river ships,

DC below 230V, AC 440V50Hz or 450V60Hz power grid, single power is 12kW-900kW, used to control

and monitor the work of the main generator, and the electrical energy sent by the ship or the shore power

sent by the main power distribution board to the whole ship electrical equipment for distribution.

Category:

Description

IS200JPDFG2AED MARK VIe DC PDM CARD

The power distribution board is suitable for AC and DC power stations of coastal, ocean and river ships,

DC below 230V, AC 440V50Hz or 450V60Hz power grid, single power is 12kW-900kW, used to control

and monitor the work of the main generator, and the electrical energy sent by the ship or the shore power

sent by the main power distribution board to the whole ship electrical equipment for distribution.

IS200JPDDG1AAA

1. When the power grid loses power, it can automatically start the diesel generator and automatically close the power supply within 20 seconds.
2. When the diesel generator power supply, if the power grid load exceeds 90% of the capacity of a single machine, the

standby diesel generator set will be automatically started, and the automatic closing and frequency modulation load adjustment will realize the parallel operation of the two machines.
3. When the power grid load exceeds 95% of the total capacity of the power station, the non-essential load is automatically unloaded after a 1-minute delay (time is adjustable).
4. When two diesel generators are running in parallel, if the power grid load is less than 40% of the power station capacity,

the unit that is connected in parallel will automatically transfer the load and automatically detaching it from the power grid.
5. Overload the query function. Before starting heavy load, heavy load inquiry should be carried out, which is calculated by the

automatic power station. If the power station capacity allows starting, the starting command will be issued. If the capacity of the

power station is small and the operation is single, the standby diesel generator set will be automatically started. The heavy load can

only be started after the automatic power station sends the starting command to ensure that the power grid will not cause overload tripping due to sudden start of the high-power motor.
6. The automatic power station has self-test function.
Seven. The automatic power station has the extended alarm function stipulated in the AUTO-O specification.
8. Sequential start of important loads.

Please contact Sunny sales@xiongbagk.cn for the best price.

➱ sales manager: Sunny
➱ email mailto: sales@xiongbagk.cn
➱ Skype/WeChat: 18059884797
➱ phone/Whatsapp: + 86 18059884797
➱ QQ: 3095989363
➱ Website:www.sauldcs.com