Description
Product details:
- 3636R/3636T
- Non-triplicated, RO
- 32, non-commoned
- 125 VAC/VDC,maximum
- 2A, maximum
- 10 mA, 5 VDC
- Silver Blue
- 2,000 V A, 150 wattsmaximum
The TSAP was loaded and run during the seismic test, testing all TUT components. And support automated test data collection. Record the generated data in the TUT operation according to the application described in the project function diagram. The data also support the performance test during the contact of the monitoring module 3636T electromechanical relay. In addition, maneuverability tests were conducted after the seismic tests were completed.
The acceptance criteria for seismic tests are as follows, planned based on Appendix 6 of the main test, Ref. 23 and EPRI TR-107330, Section 4.3.9:
• During and after the application for OBE and SSE, the TUT shall operate vibrating as intended. Normal running performance data (input, output, and diagnostic metrics) should be acted on as expected.
• All connections on the TUT should remain intact, all modules installed in the TUT should remain fully inserted, and no Tutankhamun functional or non-functional parts will fall off during and after the application of OBE and SSE vibration.
• Operating chassis power normally open alarm relay contacts and contacts Model 3636T electromechanical relay module output contacts in OBE and SSE vibration application. Relay contacts shall change state to comply with TSAP. There must be no false change in the state of relay contacts lasting longer than 2 ms. Any false power status change alarm relay contacts shall not last longer than 2 ms from open to closed.
•TUT shall pass operability tests after completion of seismic testing.
Please contact Sunny sales@xiongbagk.cn for the best price.