SDCS-PIN-48-SD ABB Pulse transformer board

General Information
Product ID:3BSE004939R1012
ABB Type Designation:SDCS-PIN-48-SD
Catalog Description:SDCS-PIN-48-SD; SDCS-PIN48-SD PULSE TRANSFORMER BOARD
Country of Origin:Thailand (TH)
Customs Tariff Number:85049090

Category:

Description

General Information
Product ID:3BSE004939R1012
ABB Type Designation:SDCS-PIN-48-SD
Catalog Description:SDCS-PIN-48-SD; SDCS-PIN48-SD PULSE TRANSFORMER BOARD
Country of Origin:Thailand (TH)
Customs Tariff Number:85049090
Invoice Description:SDCS-PIN48-SD PULSE TRANSFORMER BOARD
Made To Order:No
Minimum Order Quantity:1 piece
Order Multiple:1 piece
Quote Only:No
Selling Unit of Measure:piece
Dimensions
Product Net Weight:0.328 kg
Package Level 1 Units:1 piece
Technical

SDCS-PIN-48-SD

Frame Size:Spare_Parts
Additional Information
Product Name:SDCS-PIN48-SD PULSE TRANSFORMER BOA
Classifications
UNSPSC:39122004
Environmental
WEEE Category:Product Not in WEEE Scope
The bus method can only have two villages at the same time, to be specific, if each village does not call at one time, there is no signal on the bus in the transmission, at this time A wants to call
86
1.A first dials B’s number and sends A signal from A’s phone that A needs to call to Coordinator 2. The coordinator receives the signal, looks at the bus and finds that it is now idle, gives consent for A to transmit, and gives control to A3. And then A starts texting B
4. At this time, C also wants to send a message, and he also sends out a signal to call the coordinator
5, the coordinator will have A judgment at this time, if he judges that the information to be transmitted is more important than A, he will interrupt A’s call and let C pass it first; If he judges that C’s message is not as important as A’s, then he disagrees with C’s signal transmission until A’s transmission is complete. If A is not finished, D also signals to call, and after the coordinator’s judgment, D’s information importance is lower than A but higher than C, then even if C is the first, you have to wait for A to play B, and finally C, the queue is based on strength, like the law of the jungle. The coordination process described above is called “arbitration.
A calls B, where A is the transmitter called the “master module” and B is the receiver called the “slave module.

Please contact Sunny sales@xiongbagk.cn for the best price.

➱ sales manager: Sunny
➱ email mailto: sales@xiongbagk.cn
➱ Skype/WeChat: 18059884797
➱ phone/Whatsapp: + 86 18059884797
➱ QQ: 3095989363
➱ Website:www.sauldcs.com